environment


Hydrogeologic Services in Support of Two New Production Wells,
Prescott Valley, Arizona  


Matrix New World Engineering (Matrix) was contracted by the Town of Prescott Valley (the Town) to perform siting, permitting, design and drilling, and testing oversight of two new production wells. The Town plans to add a new well to the northeastern portion of the North Well Field, tentatively named the "Little Pete Well". A second production well is planned in the vicinity of Antelope Park.

Both wells are expected to encounter upper alluvial materials underlain by fractured volcanic rocks. Dual-tube drilling technology is to be used. Anticipated production rates are between 500 and 1,500 gpm. Matrix's scope of services for this multiple well installation project included:
• Well Permitting
• Preparation of Technical Specifications Construction Oversight and Testing
• Well Completion Report
 More >